Standard lead time to ship once your order is placed averages 4 to 6 months but can be shorter depending on production demand.
NOTE! – Due to manufacturer design changes of the gearbox in 2006, the gearbox seal is smaller on these machines for models made from 2006 on. If you have a 2006 or later model machine please make sure to add a replacement seal to your order to prevent leaks occurring from your gear box. For newer models a replacement seal is highly recommended, but not required.
__